§ 8.04.560 SEEPAGE BEDS.
   A.   General Provision. A seepage bed may only be installed when the permeability is moderately rapid or faster.
   B.   Absorption Area. The total bottom absorption area required for a seepage bed shall be one and one-half times the absorption area specified in Table I (See Appendix B).
   C.   Design. Construction features shall conform to § 8.04.450 through § 8.04.540. Distribution lines shall be equally spaced with no more than six (6) feet center to center. Seepage beds shall be constructed so that construction equipment does not drive over the bottom of the bed.
(Ord. O-201711-51-031, passed 11-14-2017)