A. General Provision. A seepage bed may only be installed when the permeability is moderately rapid or faster.
B. Absorption Area. The total bottom absorption area required for a seepage bed shall be one and one-half times the absorption area specified in Table I (See Appendix B).
(Ord. O-201711-51-031, passed 11-14-2017)