The final storm water management plan shall include, but not be limited to the following:
(A) All calculation, assumptions, and criteria used in the design of the storm water management facility;
(B) All plans and profiles of proposed storm sewers and open channels including horizontal and vertical controls, elevations, sizes, slopes, and materials;
(C) Location, dimensions, and design details required for the construction of all facilities;
(D) A description of the operation and maintenance needs for the storm water management facility;
(E) All information relative to the design and operation of emergency spillways;
(F) Project specifications relative to erosion and sedimentation control. (Refer to Best Management Practice for Construction Activities prepared by the Kentucky Natural Resources and Environmental Protection Cabinet for design guide line associated with erosion and sediment control.); and
(G) All easements, rights-of-way, ownership, and maintenance responsibilities for all storm water management control structures during and after development. The identity of the responsible individual, corporation, or association and the specific maintenance must be outlined on the plan.
(Ord. 2017-07, passed 11-27-2017)