§ 150.089 EROSION CONTROL.
   Plans for storm water conveyance systems shall include appropriately designed temporary and permanent erosion-control measures for the open channel structures and all de-vegetated land draining to both open and closed conduits within the system. (Refer to Best Management Practice for Construction Activities prepared by the Kentucky Natural Resources and Environmental Protection Cabinet - should be used as a design manual for erosion and sediment control.)
(Ord. 2017-07, passed 11-27-2017)