The sanitary sewer lead from any house or commercial building or structure that has a basement or crawlspace as a component of its structure shall be installed no less than half the distance between the floor joist of the first floor and the basement floor; and no sanitary drain shall be below the footer in any other instance. In no event will any clean water connection be tied to a sanitary line.
(Ord. 016-2021. Passed 5-17-21.)