§ 98.03 FEES.
   A permit issued by the Director of Community Development shall be required before any person, firm or corporation may construct a sidewalk. Before any work is begun on the construction of the sidewalk, the Village Engineer shall set stakes fixing the location and grades of the sidewalk. All costs are to be paid by the applicant.
(2000 Code, § 98.03) (Ord. 308, passed 8-5-1940; Ord. 1147, passed 6-7-1982)