(a) All pedestrian and bicycle trails shall be designed and constructed in accordance with the specifications shown in Standard Detail ST-1.
(b) Erosion and Sediment Control. Erosion and Sediment Control methods shall be implemented as required by Section 1307.10
Stormwater Management and Erosion & Sediment Control of this Ordinance. (Ord. 2022-13. Passed 11-10-22.)