APPENDIX A: APPLICATION FOR DEMOLITION PERMIT
APPLICATION FOR DEMOLITION PERMIT
                                          Permit No.              
                                          Fee                     
Name of Contractor                                                                              Date                 
Address                                                                                            City                   
Phone                                                                                          Per                   
General Description of Building:                                                                                     
                                                                                                                                    
Dimensions of Building: Height:                                                                                     
Dimensions Floor 1:                                                   Floor 2:                                     
Basement:                                                     Other Floors:                                         
Total Square footage:                                                                                                    
Location of Building:                                                                                                     
Legal Description of Premises:                                                                                       
The water service must be disconnected at the water main and sanitary sewer plugged with concrete and be approved by the City Engineer or his designee.
Approved by                                                                                 Date                  
         City Engineer or his designee
Will it be necessary to barricade or fence off walkways?                                                
Will aprons be necessary?                                                                                             
On a separate sheet of paper, submit a drawing indicating fences, barricades, aprons, canopies and other safeguards which will be used in connection with wrecking of above mentioned building.
Date Demolition Bond Expires                                                                                      
Date Demolition to Begin                                                                                              
Time Limitation set by City Engineer or his designee                                                      
NOTIFICATION OF UTILITY COMPANIES:
State law requires the notification to owners or operators any underground utility facilities of excavation at least 48 hours but not more than 14 days before any excavation. Applicant must submit copy of letter(s) sent or to be sent to utility companies and must inform City Engineer or his designee of any utility company responses, if any.
FILLING OF OPENINGS:
On completion of demolition, the site shall be necessary with clean soil, cinders or other inorganic material and graded to a level not lower than nor more than twelve (12) inches above the legal of sidewalks, alleys or adjoining property with proper allowance for settlement.
DEBRIS:
Debris caused from the demolition of a building or structure in excess of that required to fill openings as provided in above paragraph shall be removed from the site as wrecking progresses. No salvaged material shall be left on the premises.
PENALTY:
Any person, firm or corporation violating any of the provisions of this ordinance shall be fined according to the Uniform Fine Schedule in § 10.99 of the city code.
OWNER'S SIGNATURE                                                                                         
WRECKING CONTRACTOR'S SIGNATURE                                                       
APPROVED BY                                                            DATE               
         City Engineer or his designee
(Ord. 775, passed 6-17-92 ; Am. Ord. 1326, passed 2-20-08 )