§ 52.100 CIU AND NSCIU BASELINE MONITORING REPORTS.
   (A)   Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under40 CFR 403.6(a)(4), whichever is later, existing CIUs currently discharging to or scheduled to discharge to the POTW shall submit to the Board a report which contains the information listed in division (B), below. At least 90 days prior to commencement of their discharge, new sources, and sources that become CIUs subsequent to the promulgation of an applicable categorical standard, shall submit to the Board a report which contains the information listed in division (B), below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.
   (B)   CIUs described above shall submit the information set forth below.
      (1)   All information required in §§ 52.062(A)(1)(a), 52.062(A)(2), 52.062(A)(3)(a), and 52.062(A)(6).
      (2)   Measurement of pollutants.
         (a)   The CIU shall provide the information required in § 52.062(A)(7)(a) through (d);
         (b)   The CIU shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this division;
         (c)   Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the CIU should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to the Board;
         (d)   Sampling and analysis shall be performed in accordance with §§ 52.132 and 52.133;
         (e)   The Board may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures;
         (f)   The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW.
      (3)   Compliance certification. A statement, reviewed by the CIU's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements.
      (4)   Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in § 52.101.
      (5)   Signature and report certification. All baseline monitoring reports must be certified in accordance with § 52.113(A) and signed by an authorized representative.
(Ord. 9-2016, passed 6-7-2016)