§ 52.040 PRETREATMENT FACILITIES.
   (A)   In the event that a user is exceeding the limitations as set forth in §§ 52.015 through 52.021, the Board shall direct the user causing the discharge of any such materials to cease and desist from those activities or operations which cause a violation of established discharge standards or to provide wastewater treatment as necessary to comply with this chapter and to achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in §§ 52.015 through 52.021 within the time limitations specified by EPA, the state, or the board, whichever is more stringent.
   (B)   Any facilities necessary for compliance shall be provided, operated, and maintained at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the Board for review, and shall be acceptable to the Board before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the Board under the provisions of this chapter.
   (C)   Any facility classified as an industrial treatment plant per 327 IAC 5-22 shall meet the operator certification requirements in accordance with 327 IAC 5-22, as amended.
(Ord. 9-2016, passed 6-7-2016)