§ 56.42 EXISTING STRUCTURE INSTALLATIONS STANDARDS - STRUCTURE MOUNTED.
   (A)   Streetlights/traffic signals/utility poles.
      (1)   All antennas shall be mounted in a cylinder form and concealed within a shroud at the top of the building.
      (2)   Antenna panels or other equipment shall be wired in a manner minimizing exposed cables.
      (3)   All undergrounded equipment, including any pull boxes or other cabinetry, shall be located entirely underground and flush with existing sidewalk or ground surface.
      (4)   Where the small utility facility requires a replacement structure, all other equipment associated with the antennas shall either be mounted in the same shroud that houses the antennas, within the replacement structure, or underground.
      (5)   Where the small utility facility requires a replacement structure, it shall be no further than five feet from the original structure.
      (6)   The diameter of the replacement structure, including any concealment elements, shall be a maximum of 12 inches.
      (7)   The height of the support structure may extend a maximum of five feet beyond the height of the existing structure or the structure it is intended to replace, or nearest existing piece of vertical infrastructure exceeding 25 feet in height.
      (8)   Antenna installations located in the public right-of-way or on streetlights or traffic signal standards shall be limited to equipment components that are compatible in scale and proportion to streetlights and traffic signals and the poles on which they are mounted.
      (9)   Equipment shall be painted or otherwise coated to be visually compatible with existing lighting and signal equipment.
   (B)   Flagpole mount.
      (1)   All antennas shall be mounted in a cylinder form and concealed within a shroud at the top of the building.
      (2)   All antenna panels and accessory equipment shall be mounted inside the tower.
      (3)   Screening materials shall match the size, color, texture and design of the existing tower.
      (4)   All accessory equipment shall be located inside the existing equipment enclosure.
      (5)   All new utility lines should be located underground.
(Ord. O-15-20, passed 6-8-2020)