(A) When an opening has been made in sodded areas, not only the actual area disturbed shall be restored, but any adjacent sod area which may have been damaged or destroyed in connection with the permittee’s work, shall also be renewed. If the existing sod can be removed without damage, it may be relaid, but all damaged sod shall be replaced with new sod.
(B) Restoration of sod by the permittee will not be considered complete until all restored sod has knitted with the subgrade, and all maintenance necessary (such as watering) shall be the responsibility of the permittee and shall be considered a part of the restoration.
(2000 Code, § 153.16) (Ord. O-23-81, passed 10-26-1981)