Permits may be withheld from issuance under the following circumstances:
A. Pending Amendments
A building permit or certificate of occupancy for change in use may be withheld during the period in which an amendment to this Zoning Code is pending, after recommendation by the Planning and Zoning Commission, or introduced by Council, if such amendment would affect the building or use applied for. However, the permit shall not be withheld for more than ninety (90) calendar days after the application was submitted, or after final action by Council has been taken, whichever is the shorter period.
B. Noncompliance
A building permit shall not be issued for a residential building on a lot unless the following are true:
1. The lot abuts, for the required width, upon a dedicated street or upon a street in which dedication is pending.
2. All utilities, pavements and other required improvements are constructed, or their construction is assured.
3. The lot is located in a duly recorded subdivision or resubdivision, an approved allotment or a lot of record, and complies with all other requirements of this Zoning Code.
(Ord. 2000-128. Passed 12-6-00; Ord. 2008-131. Passed 1-21-09.)