A. Applications for a building permit shall be accompanied by:
1. A plat showing the dimensions of the lot to be developed, the lot number, information as to any unusual natural or topographic features and evidence that the lot has been surveyed and property located;
2. A site plan, drawn to scale, showing the location, by dimension, of any easement, of proposed and existing buildings, driveways, walks and proposed finished grades, the location, distance to and use of adjacent buildings on adjoining lots, and the location and size of the garage for each residential building, whether the garage is included in the application or to be built at a future date;
3. Such other drawings and information as may be required for a building permit application; and
4. A fee as established by ordinance.
B. Required drawings, for new construction, additions and alterations of multifamily and nonresidential buildings that are subject to Planning and Zoning Commission review, shall be on file in the Building Department and available for public inspection not less than fourteen (14) business days prior to the Planning and Zoning Commission meeting at which such drawings will be considered.
(Ord. 2000-128. Passed 12-6-00; Ord. 2008-131. Passed 1-21-09.)