12-1-2: BUILDING PERMIT REQUIRED:
   A.   For the construction of any building or enclosed structure greater than two hundred square feet (200), the owner of such building project must apply to the town for a building permit, which shall include a plumbing permit, electrical permit, and zoning permit. Application shall be made at the town office on a form provided by the town for such purposes. Application must be made before the start of construction and construction may not start until such time as the plans have been approved by the building inspector and zoning administrator.
   B.   The applicant shall pay to the town an administrative fee for processing the application and shall further pay for the cost of the plan review and building inspection as set out in a schedule provided by the building code inspector which will be available at the town office.
   C.   Plans shall be reviewed and inspections made in accordance with the rules and procedures of the Bozeman city building code enforcement division.
(Ord. 297, 8-9-2004; amd. Ord. 24-005, 5-9-2024)