§ 52.130 INSPECTION AND RECORDS.
   (A)   The pipe layer shall notify the Public Works Director when the building connection is ready for inspection and connection to the public sewer. The Public Works Director shall be notified not less than 48 hours in advance of the time any connection is to be made to any public sewer or drain of the city, and such connection shall be made only in the presence of the Inspector and according to his instructions. The Public Works Director shall be afforded all reasonable opportunity to oversee the construction of all parts of any building sewer or drain connected directly, or indirectly, or intended to be so connected, to any public sewer or drain of the city, and to obtain and record the location and other pertinent facts with respect to such building sewer or drain. This requirement also shall apply to repairs or alterations to building connections, drains, or pipes discharging thereto.
   (B)   No building connection or drain or connection to a public sewer or drains shall be covered until it has been inspected by the Public Works Director and found to conform to the requirements and established standards of the Department in all respects and be satisfactory as to the quality of the workmanship and materials.
   (C)   The Public Works Director shall keep a record of all connections made to public sewers and drains under this chapter and all repairs and alterations made to building connections or drains connected to or discharging into public sewers and drains of the city or intended to so discharge. All persons concerned shall assist the Public Works Director securing data needed for such records.
(Ord. passed 1-17-95) Penalty, see § 52.999