§ 52.127 COVER AND ALIGNMENT.
   The cover over the crown of the building connection shall be at least four feet to afford protection from frost action. Any deviation from the minimum cover required shall be done only with the written permission of the Public Works Director. The building connection shall be laid at a uniform grade and in straight alignment. Changes in direction shall be made only at clean outs or manholes as required by the Public Works Director. Clean outs shall be provided at maximum spacing of 75 feet on straight runs.
(Ord. passed 1-17-95) Penalty, see § 52.999