§ 52.126 BUILDING CONNECTION.
   Wherever possible, the building connection shall be brought to the building at an elevation below the basement floor. In no instance shall the connection enter the building through a footing. In all buildings in which any building sewer is too low to permit gravity flow to the public sewer, sanitary or industrial sewage carried by such sewer shall be lifted by means approved by the local Building Inspector and discharged to the building connection. The requirements of the Planning and Community Development Department shall be observed with respect to fixtures inside of the exterior face of any building or structure and with respect to an exterior pump chamber from the point of discharge.
(Ord. passed 1-17-95; Am. Ord. passed 2-7-09) Penalty, see § 52.999