§ 52.115 BUILDING CONNECTION PERMITS REQUIRED.
   (A)   No person shall uncover, make any connection with or opening into, use, alter, or disturb any public sewer, or appurtenances thereof, unless a proper permit therefore shall have been duly issued by the Public Works Director, as hereinafter provided. All building connection installation and alteration work shall be performed by pipe layers certified by the Department, or by licensed plumbers.
   (B)   There shall be two classes of building connection permits: Class A permits, which shall authorize the connection of residential establishments generating only sanitary sewage, as defined in § 52.002, to the public sewer; and Class B permits, which shall authorize the connection of commercial or industrial establishments to the public sewer. Building connection permit fees shall be assessed based on the number of connections to the public or private sewer.
   (C)   Application for a building connection permit shall be made by a certified pipe layer for the building to be connected and shall be made on an application form provided by the Public Works Director. Each application shall be supplemented with the plans and specifications for the building sewer connection and such other information relating to the building and the wastes to be discharged as may be considered pertinent by the Public Works Director. At his discretion, the Public Works Director may also require that all plans, specifications, and data so submitted shall bear the seal and signature of a professional civil engineer registered in the state of New Hampshire. A permit and inspection fee will be established by the Board of Highway Commissioners as noted in § 52.162.
(Ord. passed 1-17-95) Penalty, see § 52.999