§ 155.35 SUBMITTAL.
   (A)   Unless otherwise identified or noted in a separate document, all submittals are assumed to comply with the provisions of these regulations. Failure to do so may result in the return of submittals. Prior to the submission of the preliminary plat for Planning Commission action, the developer, the design engineer/surveyor shall prepare a rough sketch of the proposal and meet with the Planning Commission staff and the City Engineer to discuss subdivision requirements, procedures, and possible issues related to the development of the property in question. Only after this pre-application conference will the preliminary plat be accepted for review.
   (B)   The developer, design engineer, or surveyor shall submit seven blue-line prints of the proposed preliminary plat to the Planning Commission staff by the deadline. Also required for submission is a completed application for review, a completed checklist signed and dated by the developer and the surveyor/design engineer, a digital copy of the layout of the proposed plat in Auto Cad.dwg format, review fee, and copy of deed(s) for the property being subdivided.
(Ord. passed 5-22-03)