(A) Prior to completion of required improvements, the developer may submit the final plat with an acceptable surety.
(B) Unless otherwise identified or noted in a separate document, all submittals are assumed to comply with the provisions of these regulations. Failure to do so may result in the return of submittals. The developer, the design engineer, or the surveyor shall submit seven blue-line prints of the proposed final plat to the Planning Commission staff by the deadline. Also required for submission is a completed application for review, a completed checklist signed and dated by the developer and surveyor/design engineer, a digital copy of the plat in Auto Cad .dwg format, review fee, recording fee, and a letter from the City Engineer attesting to the completion of the required improvements or an acceptable surety.
(Ord. passed 5-22-03)