(A) Activities that are applicable to this chapter, per § 114.003, must provide a construction site stormwater pollution prevention plan (CSSPPP).
(B) The construction site stormwater pollution prevention plan may be a full sized plan sheet with necessary notes for requirements or may be a narrative explaining construction site operating procedures to minimize or eliminate stormwater pollution as a result of construction activities.
(C) The items covered in an approvable CSSPPP are dependent on the activities and the materials required on-site to complete the project. Therefore, the detail of the plan may be more or less depending on-site activities planned.
(D) Standard items included in a CSSPPP are, but are not limited to:
(1) Purpose;
(2) Construction site description;
(3) Activities/materials to be addressed in the CSSPPP;
(4) Construction site operating procedures;
(5) Activities/materials monitoring and maintenance; and
(6) Emergency and spill procedures.
(E) Should construction site activities/materials change during construction, the CSSPPP must reflect the changes. Therefore, the plan must be kept on-site at all times and be altered as necessary with the approval of the Inspector. Should major changes be warranted, a revised plan must be submitted for review and approval.
(Ord. 2008-06, passed 6-18-2008)