913.02 REQUIREMENTS OF PLAN.
Any plan for erosion and sedimentation control required under Section 913.01 shall be set forth in accordance with guidelines and policies as established by the Summit Soil and Water Conservation District, and shall include but not be restricted to the following matters:
(a) The areas of such described premises that may be exposed at any one time;
(b) The type of temporary vegetation and/or mulching that should be used to protect exposed areas of such described premises during the:
(1) Construction of any type of improvements thereon; or
(2) Changes being made in the contours thereof; or
(3) In removal or destruction of topsoil.
(c) The locations, construction and maintenance of sediment basins, or other control measures that should be constructed and maintained on the described premises.
(d) The type of permanent and final vegetation and structures that should be planted and installed on the premises and the time within which such vegetation and structures are to be planted and installed.
(e) Description of the type of soil comprising the premises and the physical properties of each type.
(Ord. 70-79. Passed 6-28-79.)