1181.08 ARCHITECTURAL REVIEW BOARD.
   (a)   Approval by the Architectural Review Board shall not be required prior to the issuance of a permit by the Building Commissioner so long as the Solar Energy System will not be visible from a public right-of-way. In the event the Solar Energy System will be visible from a public right-of- way, as determined by the Building Commissioner, the Building Commissioner shall submit the plans for the proposed Solar Energy System to the Architectural Review Board in accordance with Section 1327.01.
(Ord. 2024-11. Passed 5-6-24.)