(a) Such uses shall be located on collector thoroughfares, adjacent to nonresidential uses, such as commerce, industry, or recreation, or adjacent to sparsely settled residential uses.
(b) No zoning certificate shall be issued until final Site Plans have been submitted and approved by the Planning Commission. Final site plans shall show the following:
(1) Drainage (including storm water) approved by the City Engineer;
(2) Location of all buildings (All structures shall be located at least one hundred (100) feet from all property lines);
(3) Walks;
(4) Off-street parking and service facilities;
(5) Design and construction of all access drives, access points to public streets, and traffic flow and its relation to abutting streets;
(6) Fuel tanks (if any);
(7) Water supply;
(8) Fences and walls;
(9) Landscaping;
(10) Signage (There shall be no more than one (1) advertisement oriented to each abutting road identifying the activity);
(11) Outside lighting (No lighting shall constitute a nuisance and shall in no way impair safe movement of traffic on any street or highway; no lighting shall shine directly on adjacent properties).