1242.06 CORRECTION PERIOD.
   All violations shall be corrected within a period of thirty days after the written order is issued or for a longer period of time as indicated by the Zoning Inspector. Any violations not corrected within the specified time period shall be reported to the Village Law Director who shall initiate prosecution procedures.
(Ord. 19-83. Passed 4-4-83; Ord. 75-96. Passed 11-18-96.)