1242.02 ZONING PERMITS REQUIRED.
   (a)    Before construction, changing the use of, or structurally altering any building or sign, including accessory buildings, or changing the use of any premises, application shall be made to the Zoning Inspector for a zoning permit. The zoning permit requirement shall not include interior remodeling if the type of use is not changed and shall not include exterior upkeep and maintenance. The applications shall include the following information:
      (1)    The location of the lot and existing zoning and land use of the property and the immediately surrounding area.
       (2)    A plot plan drawn to scale showing the exact dimensions of the lot to be built upon.
       (3)    The location, dimensions, height and bulk of structures to be erected.
       (4)    The intended use.
       (5)    The yard, open area and parking dimensions.
       (6)    Any other pertinent data as may be necessary to determine and provide for the enforcement of this Zoning Code.
   (b)    Before construction or alteration of any sign or outdoor advertising device requiring a zoning permit (See Chapter 1258) a zoning permit shall be secured.
   (c)    Within ten days after receipt of any application, the Zoning Inspector shall issue a zoning permit if the application complies with the requirements of this Zoning Code and the application is accompanied by the proper fee.
   (d)    The zoning permit shall become void at the expiration of six months after the date of issuance unless construction is started. If no construction is started or use changed within six months of the date of the permit, a new permit is required upon application.
(Ord. 19-83. Passed 4-4-83; Ord. 75-96. Passed 11-18-96.)