Skip to code content (skip section selection)
Compare to:
SEC. 61.13. IMPROVEMENT BOND PROCESSING FEE.
   (Amended by Ord. No. 184,054, Eff. 3/6/16.)
 
   The Bureau of Engineering may require a permit applicant to post a public improvement bond to guarantee that improvements will be made in a public right-of-way or to protect or replace existing improvements, and shall charge and collect a fee of $515 to process a public improvement bond. If necessary to avoid a bond default, the Bureau of Engineering shall charge an additional fee of $433 to extend the bond or process a replacement bond. The Bureau of Engineering shall require all applicants for a Class "B" permit to post a public improvement bond, and may also require a permit applicant to post a bond when it determines that the project or activity for which a permit is sought could damage existing public improvements.