(a) All electric wiring, for which a permit is required shall be inspected and approved by the Department before being concealed, energized or used. All fees required by this Code shall be paid by the permittee prior to the energizing or use of such wiring.
(b) No person shall use, operate or maintain, or cause or permit to be used, operated or maintained, any electric wiring until it is inspected and approved.
(c) No serving agency shall supply, or cause or permit to be supplied, electric energy to any electric wiring until the wiring has been inspected and approved.
(d) Nothing contained in this section shall prohibit the temporary use of electric energy when and as specifically provided for in LAMC Section 93.0308. (Amended by Ord. No. 184,692, Eff. 12/30/16.)
(e) Nothing contained in this section shall prohibit the inspection of any electric wiring even though no permit is required therefor.
(f) Inspections shall be required for construction or installation of electrical work done on the premises of a Fabricator to whom an approval has been issued pursuant to the provisions of Division C, Article 6, Chapter IX of the LAMC. (Amended by Ord. No. 184,692, Eff. 12/30/16.)
EXCEPTION: State of California approved manufactured mobile homes or building.