Skip to code content (skip section selection)
Compare to:
SEC. 92.0130. FEES FOR PLAN CHECKING.
   (Amended by Ord. No. 185,587, Eff. 7/16/18.)
 
   (a)   Before formally accepting a set of plans and specifications for checking, the Department shall collect a plan check fee.
 
   (b)   Plan checking fees shall be as follows:
 
      Dumbwaiter, each.....$100.00
      Sidewalk elevators, each.....$100.00
      Private residential elevator, each.....$100.00
      Escalators and moving walks, each.....$158.00
      Hydraulic elevator-Direct Plunger, each.....$129.00
      Hydraulic Elevator-Cabled, each.....$432.00
      Cabled elevators, each.....$432.00
      Inclined elevator, each.....$432.00
      Vertical Platform (Wheelchair) Lift, each.....$100.00
      Inclined Platform (Wheelchair) Lift, each.....$100.00
      Stairway Chair Lift, each.....$100.00
      Material Lift, each.....$129.00
      Reciprocating Conveyer, each.....$129.00
      Rack and Pinion Elevator, each.....$432.00
      Conveyances not covered in this list.....$208.00/unit.
         If plan check time exceeds 2 hours, the Department will collect a plan check fee as specified in LAMC Section 98.0415(e).
      Modernizations and Alterations.....$208.00.
         If plan check time exceeds 2 hours, the Department will collect a fee as specified in LAMC Section 98.0415(e).
 
   (c)   The plan check fees required by the provisions of this section are in addition to the inspection fees required elsewhere in this Code. The total plan check fee shall be paid at the time plans are submitted for plan check.
 
   (d)   The Department may collect a plan check fee as specified in LAMC Section 98.0415(e) for the plan checking of any custom, specialized or non-standard elevator or related equipment, or for any elevator or related equipment not included in the above plan check schedule.
 
   (e)   Off-hour Plan Check. Upon request by an applicant and accepted by the Department, an off-hour plan check fee per LAMC Section 98.0422 may be collected.