(Added by Ord. No. 171,258, Eff. 8/30/96.)
The engineer or architect shall prepare a pre-design field investigation report in accordance with Department guidelines and shall file the report when the plans are filed for permit. The plans shall include a description of the existing lateral force resisting system at and below the base.