Skip to code content (skip section selection)
Compare to:
SEC. 62.49. BUILDING MATERIAL – DEPOSIT IN STREETS.
   (Amended by Ord. No. 128,226, Eff. 10/12/64.)
 
   (a)   No person shall fail to remove any protection fence, protection canopy, building material, or equipment of any kind whatsoever, or any debris deposited or maintained on any public street, within five (5) days after the completion of the construction, alteration, repair or demolition of any building in front of which such fence, canopy, material, equipment or debris is deposited or maintained, nor fail to leave the street in as good a condition as the same was prior to the placing of such fence, canopy, material, equipment or debris thereon.
 
   (b)   The Board shall proceed to do such work or have the same done upon failure of any person charged so to do under this section, and the costs necessarily incurred by the Board in doing such work may be recovered by the City from such person.