Skip to code content (skip section selection)
Compare to:
Sec. 13.80. Manner of Construction.
 
   Surface filling materials placed within two feet of and between the rails of a spur track shall be installed and maintained to the satisfaction of the Board of Public Works. The Board reserves the right to prescribe the use of wood, asphalt or concrete as a filling material. Other filling materials may be substituted provided such are acceptable to both the railroad and Board. All work and materials shall be in accordance with Federal and State laws and standards.
 
SECTION HISTORY
 
Based on Ord. No. 61,206.
Amended by: Ord. No. 151,832, Eff. 2-10-79, Oper. 2-25-79; Ord. No. 156,921, Eff. 10-15-82.