12-2-2: BUILDING PERMIT; CERTIFICATE OF OCCUPANCY:
It shall be a violation of this title for any person to change or permit the change in the use of land or buildings or structures or to erect, alter, move, or improve any building or structure until a building permit or certificate of occupancy has been obtained under the following conditions: (Ord. 86, 2-16-1982)
   A.   Building Permit 1 : Whenever any structure or building is to be improved or erected, moved, or structurally altered, a building permit shall be obtained from the code enforcement officer. The code enforcement officer may require every applicant for a building permit to furnish the following information: (Ord. 86, 2-16-1982; amd. 2006 Code)
      1.   A plot plan, drawn to scale, showing the exact size, shape, and dimensions of the lot to be built upon, the exact size and location on the lot of all existing buildings and structures, and the exact size and location on the lot of the structure or building proposed to be repaired, altered, erected, or moved, and the size, arrangement, number of parking stalls, movement of vehicles and ingress and egress drives for all off street parking and loading facilities.
      2.   A declaration of the existing and intended use of each existing and proposed building or structure on the lot and the number of families and housekeeping units which each existing building accommodates and which each existing and proposed building is designed to accommodate.
      3.   Additional information relating to the proposed improvement needed to determine compliance with these regulations.
      4.   A survey prepared by an engineer registered in the state of Oklahoma of the boundaries of the lot on which the improvement is proposed to be located. (Ord. 86, 2-16-1982)
   B.   Certificate Of Occupancy: No change shall be made in the use of any land or building or structure after the effective date hereof until a certificate of occupancy is obtained from the code enforcement officer certifying that all of the provisions of this title are complied with. Whenever a building permit is issued for the erection of a new building or structure, an occupancy permit shall also be required prior to occupancy. (Ord. 86, 2-16-1982; amd. 2006 Code)

 

Notes

1
1. See also section 11-1-4 of this code.