(A) The size, slope, alignment, and materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, and testing, and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the village.
(B) Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by that building drain shall be lifted by an approved means and discharged to the building sewer, at the owner’s expense.
(Ord. 44, passed - -93)