The subdivider shall cause gas, electrical power, cable television, and telephone facilities to be installed in a manner so as to make service available to each lot. The subdivider shall have written statements from all the utilities stating that the easements, as shown on the final plat, are acceptable to them.
(`99 Code, § 8.09) Penalty, see § 153.999