§ 52.005 INSPECTION OF BUILDING SERVICE LINE.
   (A)   When trenches are opened for the laying of building service lines, such trenches and service line construction shall be inspected by the POTW Director before the trenches are filled.
   (B)   The filling of the trench prior to inspection by the POTW Director shall void the connection permit and a connection to the public sewer system shall not be allowed.
(Ord. O-01-22, passed 4-7-2022)