The replacement of more than twenty-five percent of the roof covering of an existing building or structure in any period of twelve months with the same materials of which such roof was constructed shall be prohibited, unless the entire roofing is made to comply with the requirements of Section 1402.01 for new rooting.
(Ord. 125-50. Passed 9-11-50.)