§ 153.14 DISPOSITION OF DIRT AND OLD MATERIAL.
   Whenever any sidewalk shall have been ordered built, repaired, relaid or replaced, the property owner shall remove the excavated dirt together with all old material within five days from the completion of the work. It shall be the duty of the property owner, at all times while building, repairing, relaying or replacing any sidewalk, to see to it that the stakes indicating the grade of the same have not been tampered with.
(Ord. 644, passed 8- -2001)