(A) If it is not possible, due to weather conditions, for the contractor to replace the pavement within 14 days following completion of the work a coarse aggregated base eight inches thick and a cold asphaltic surface shall be applied and maintained as a temporary patch until permanent repairs can be made.
(B) In no case shall a temporary patch be maintained more than six months before permanent repairs are made.
(1998 Code, § 7-78)