§ 59.072 TIME LIMIT TO CONNECT.
   When a public sewer becomes available, the building sewer shall be connected to that sewer within 90 days and the private sewage disposal system shall be cleaned of sludge and filled with clean bank-run gravel or dirt.
(Ord. 733, passed 12-10-2007)