If any lot or parcel of real estate being connected to the sewage works is not connected to the city's water works and does not have a water meter, the sewage works connection charge shall be established on a case by case basis by the City Board of Public Works.
(1998 Code, § 9-94) (Ord. 523, passed 9-14-1992)