§ 51.103 SEWAGE WORKS CONNECTION CHARGES.
   The owner of each lot or parcel of real estate connecting to the sewage works shall pay the following connection charge in cash prior to connecting to the sewage works, which connection charge shall be based upon the customer's water meter size:
Water Meter Size
Sewage Works Connection Charge
Water Meter Size
Sewage Works Connection Charge
5/8-inch to 3/4-inch
$350
1-inch
$560
1-1/4-inch
$700
1-1/2-inch
$840
2-inch
$1,120
3-inch
$1,680
4-inch
$2,240
 
(1998 Code, § 9-93) (Ord. 523, passed 9-14-1992)