§ 52.13 EFFECT OF STREET CONSTRUCTION.
   (A)   Prior to street construction or reconstruction within the city, the Public Services Department, with the assistance of the Water Division, shall determine where new water services are required or where existing water sen ices within the street right-of-way are in need of replacement, in accordance with this article. The Public Services Division shall notify any affected property owner that a water service must be replaced. Water services must be replaced within the street right-of-way, unless good cause is shown as determined by the water superintendent, in the following instances:
      (1)   If the water service from the main to the premises is made of lead or galvanized iron pipe or copper less than three-fourth inch in diameter.
      (2)   If a single water service serves more than one property.
      (3)   If the service is damaged or deteriorated, regardless of piping material or size.
      (4)   If the replacement of a sanitary service or other utility necessitates removal of the water service.
   (B)   Unless otherwise provided by city ordinance or policy, any expenses incurred in connection with replacement of an existing water service shall be paid by the property owner, and any expenses which are not paid shall constitute a lien against the property.
(Ord. 563, passed 4-10-2017)