§ 1311.08 BASEMENT EXCAVATIONS.
   Surface water which collects in basement or foundation excavations shall not be discharged at any time into the building sewer. If the building sewer is completed before the house plumbing can be connected thereto, the builder or sewer tapper shall keep the end of the building sewer tightly closed at all times with a plumber’s plug or other watertight plug in order to prevent the surface or ground water from entering the building sewer.