The duties and responsibilities of the floodplain administrator shall include, but not be limited to the following:
A. Permit Review. Review all site plan reviews to determine:
1. Permit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures;
2. All other required state and federal permits have been obtained;
3. The site is reasonably safe from flooding;
4. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point within the City of La Mirada; and
5. All letters of map revision (LOMRs) for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the “start of construction” definition.
B. Development of Substantial Improvement and Substantial Damage Procedures.
1. Using FEMA publication FEMA 213, “Answers to Questions about Substantially Damaged Buildings,” develop detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining “market value.”
2. Assure procedures are coordinated with other departments/divisions and implemented by community staff.
C. Review, Use and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with Section 21.32.050, the floodplain administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal or state agency, or other source, in order to administer Section 21.32.150 through 21.32.200.
NOTE: A base flood elevation may be obtained using one of two methods from the FEMA publication, FEMA 265, “Managing Floodplain Development in Approximate Zone A Areas – A Guide for Obtaining and Developing Base (100-year) Flood Elevations” dated July 1995.
D. Notification of Other Agencies.
1. Alteration or relocation of a watercourse:
a. Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation;
b. Submit evidence of such notification to the Federal Emergency Management Agency; and
c. Assure that the flood carrying capacity within the altered or relocated portion of said watercourse is maintained.
2. Base flood elevation changes due to physical alterations:
a. Within six months of information becoming available or project completion, whichever comes first, the floodplain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a letter of map revision (LOMR).
b. All LOMRs for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the “start of construction” definition. Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data.
3. Changes in corporate boundaries: Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits.
E. Documentation of Floodplain Development. Obtain and maintain for public inspection and make available as needed the following:
2. Certification required by Section 21.32.150C.1 (Elevation or floodproofing of nonresidential structures);
3. Certification required by Section 21.32.150C.3 (Wet floodproofing standard);
4. Certification of elevation required by Section 21.32.170A.3 (Subdivisions and other proposed development standards);
5. Certification required by Section 21.32.200B (Floodway encroachments); and
6. Maintain a record of all variance actions, including justification for their issuance, and report such variances issued in its biennial report submitted to the Federal Emergency Management Agency.
F. Map Determination. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazard, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Section 21.32.140.
G. Remedial Action. Take action to remedy violations of this chapter as that term is defined in Section 21.32.030.
H. Biennial Report. Complete and submit biennial report to FEMA.
I. Planning. Assure community’s general plan is consistent with floodplain management objectives herein.
(Ord. 622-U § 2 (part), 2008).