8-3-17: ELECTRICITY:
   A.   Permit: No electric wiring for light, heat, or power in a building or structure, nor shall an alteration or extension of an existing electric wiring system be made, except in conformity with the provisions of this title and rules that may be adopted and promulgated by the Building Officer under the provisions of this Code, and a permit first secured, a fee for which shall include the inspection thereof when completed.
   B.   Electric Wiring And Apparatus: Adopted by reference, including those amendments thereto adopted and set forth in chapter 4 of this title, and applicable to all regulated buildings, structures, and developments as rules and regulations, are the standards for electrical connection(s), disconnection(s), wiring and apparatus set forth in: the National Electrical Code, current edition.
Said Electrical Code is now on file in the Office of the County Clerk of Lake County, Illinois, as provided by State Statute, and also in the Office of the Building Officer.
   C.   Wiring Layout With Application: Where construction or alteration work is of such size or importance that plans are required to be submitted as a part of the application for a permit, applicant shall furnish with the plans a wiring layout unless such layout is provided in general plans, showing the number and location of outlets, the size of wire to be used, the location of the control boxes, and the proposed location of the service head.
   D.   Connection For Occupant's Service: Any utility company connecting or disconnecting electrical service to a premises and/or supplying electricity may make the connection for and/or disconnection of the occupant's service in compliance with the provisions of subsection 8-4-1I of this title on a premises constructed or altered when a permit covering the electrical wiring has been issued by the Building Officer and the company's requirements for the supply of electric service have been satisfied. The utility company shall not consider this to be the final connection until a certificate of satisfactory completion has been issued by the proper Village official.
   E.   Electric Service Attachments: Electric service attachments shall be installed in compliance with the provisions of subsection 8-4-1I of this title and in accordance with the requirements for the supply of electric service of the utility company and shall be approved by the Building Officer. It shall be the responsibility of the general contractor to have the service attachments installed at such locations in compliance with the provisions of subsection 8-4-1I of this title as may be agreed upon by the utility company and the electrical contractor.
   F.   Nonmetallic Sheathed Cable: Nonmetallic sheathed cable is not permitted. (Ord. 2012-08-03, 8-8-2012, eff. 8-24-2012)