11-4-5: ACCEPTANCE; AS BUILT DRAWINGS:
Upon the completion of construction of all required public improvements required by this title, a detailed inspection of such improvements shall be made by a representative of the village, the enforcement officer, and a representative of the developer. After certification by the enforcement officer that all construction has been completed in accordance with the plans and specifications previously approved by the village, the corporate authorities will formally accept the required public improvements which are to be dedicated to the village. Prior to such acceptance, however, the engineer representing the developer shall prepare and submit to the village two (2) complete sets of as built drawings of all installed improvements on which also are shown or indicated any changes in the original construction drawings that were made during the construction period, as well as at least one copy of those same as built drawings in such digital format as required by the village engineer. (Ord. 2015-03-02, 3-11-2015)