§ 152.32  STANDARDS FOR SUBDIVISION PROPOSALS.
   (A)   All subdivision proposals including the placement of manufactured home parks and subdivisions shall be consistent with §§ 152.02 and 152.03.
   (B)   All proposals for the development of subdivisions including the placement of manufactured home parks and subdivisions shall meet Floodplain Development Permit requirements of §§ 152.07, 152.22 and 152.30 through 152.32.
   (C)   Base flood elevation data shall be generated for subdivision proposals and other proposed development including the placement of manufactured home parks and subdivisions which is greater than 50 lots or five acres, whichever is lesser, if not otherwise provided pursuant to §§ 152.06 or 152.21(H).
   (D)   Base flood elevation data shall be generated by a detailed engineering study for all Zone A areas, within 100 feet of the contour lines of Zone A areas, and other streams not mapped by FEMA, as indicated on the community's FIRM.
   (E)   All subdivision proposals including the placement of manufactured home parks and subdivisions shall have adequate drainage provided to reduce exposure to flood hazards.
   (F)   All subdivision proposals including the placement of manufactured home parks and subdivisions shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize or eliminate flood damage.
(Ord. 302, passed 9-10-2009)