§ 153.074 EROSION AND SEDIMENT CONTROL.
   (A)   The development shall conform to the natural limitations presented by topography and soil so as to create the least potential for soil erosion.
   (B)   Erosion and siltation control measures shall be coordinated with the different stages of construction. Appropriate control measures shall be installed prior to development when necessary to control erosion.
   (C)   Land shall be developed in increments of workable size such that adequate erosion and siltation controls can be provided as construction progresses. The smallest practical area of land shall be exposed at any one period of time.
   (D)   When soil is exposed, the exposure shall be for the shortest feasible period of time, as specified by the City Engineer.
   (E)   Where the topsoil is removed, sufficient arable soil shall be set aside for respreadmg over the developed area. Topsoil shall be restored or provided to a depth of four inches and shall be of a quality at least equal to the soil quality prior to development.
   (F)   Natural vegetation shall be protected wherever practical.
   (G)   Runoff water shall be diverted to a sedimentation basin before being allowed to enter the natural drainage system.
(Ord. 19-2, passed 4-11-2005) Penalty, see § 153.999