§ 96.14 SUPPLEMENTARY APPLICATIONS.
   (A)   Limitation on area. A right-of-way permit is valid only for the area of the right-of-way specified in the permit. No permittee may do any work outside the area specified in the permit, except as provided herein. Any permittee which determines that an area greater than that specified in the permit must be obstructed or excavated must before working in that greater area:
      (1)   Make application for a permit extension and pay any additional fees required thereby; and
      (2)   Be granted a new permit or permit extension.
   (B)   Limitation on dates. 
      (1)   A right-of-way permit is valid only for the dates specified in the permit.
      (2)   No permittee may begin its work before the permit start date or, except as provided herein, continue working after the end date. If a permittee does not finish the work by the permit end date, it must apply for a new permit for the additional time it needs, and receive the new permit or an extension of the old permit before working after the end date of the previous permit. This supplementary application must be submitted before the permit end date.
(Ord. 7517, passed 10-20-2009)
§ 96.15 OTHER OBLIGATIONS.
   (A)   Compliance with other laws. Obtaining a right-of-way permit does not relieve permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by the city or other applicable rule, law or regulation. A permittee shall comply with all requirements of local, state and federal laws, including but not limited to M.S. §§ 216D.01-.09 (Gopher One Call Excavation Notice System) and Minn. Rules Ch. 7560. A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the right-of-way pursuant to its permit, regardless of who does the work.
   (B)   Prohibited work. Except in an emergency, and with the approval of the city, no right-of-way obstruction or excavation may be done when seasonally prohibited or when conditions are unreasonable for such work.
   (C)   Interference with right-of-way. A permittee shall not so obstruct a right-of-way that the natural free and clear passage of water through the gutters or other waterways shall be interfered with. Private vehicles of those doing work in the right-of-way may not be parked within or next to a permit area, unless parked in conformance with city parking regulations. The loading or unloading of trucks must be done solely within the defined permit area unless specifically authorized by the permit.
   (D)   Trenchless excavation. As a condition of all applicable permits, permittees employing trenchless excavation methods, including but not limited to horizontal directional drilling, shall follow all requirements set forth in M.S. Ch. 216D and Minn. Rules Chapter 7560, and shall require potholing or open cutting over existing underground utilities before excavating, as determined by the Director.
(Ord. 7517, passed 10-20-2009)
§ 96.16 DENIAL OF PERMIT.
   The city may deny a permit for failure to meet the requirements and conditions of this subchapter or if the city determines that the denial is necessary to protect the health, safety, and welfare or when necessary to protect the right-of-way and its current use.
(Ord. 7517, passed 10-20-2009)
§ 96.17 INSTALLATION REQUIREMENTS.
   The excavation, backfilling, patching and restoration, and all other work performed in the right-of-way shall be done in conformance with Minn. Rules 7819.1100 and 7819.5000 and other applicable local requirements, in so far as they are not inconsistent with the M.S. §§ 237.162 and 237.163. Installation of service laterals shall be performed in accordance with Minn. Rules Ch. 7560 and these ordinances. Service lateral installation is further subject to those requirements and conditions set forth by the city in the applicable permits and/or agreements referenced in § 96.22(B).
(Ord. 7517, passed 10-20-2009)
§ 96.18 INSPECTION.
   (A)   Notice of completion. When the work under any permit hereunder is completed, the permittee shall furnish a completion certificate in accordance Minn. Rules 7819.1300.
   (B)   Site inspection. Permittee shall make the work-site available to the city and to all others as authorized by law for inspection at all reasonable times during the execution of and upon completion of the work.
   (C)   Authority of Director. 
      (1)   At the time of inspection, the Director may order the immediate cessation of any work which poses a serious threat to the life, health, safety or well-being of the public.
      (2)   The Director may issue an order to the permittee for any work that does not conform to the terms of the permit or other applicable standards, conditions, or codes. The order shall state that failure to correct the violation will be cause for revocation of the permit. Within ten days after issuance of the order, the permittee shall present proof to the Director that the violation has been corrected. If such proof has not been presented within the required time, the Director may revoke the permit pursuant to § 96.21.
(Ord. 7517, passed 10-20-2009)
§ 96.19 WORK DONE WITHOUT A PERMIT.
   (A)   Emergency situations. 
      (1)   Each registrant shall immediately notify the Director of any event regarding its facilities that it considers to be an emergency. The registrant may proceed to take whatever actions are necessary to respond to the emergency. Excavators’ notification to Gopher State One Call regarding an emergency situation does not fulfill this requirement. Within two business days after the occurrence of the emergency, the registrant shall apply for the necessary permits, pay the fees associated therewith, and fulfill the rest of the requirements necessary to bring itself into compliance with this subchapter for the actions it took in response to the emergency.
      (2)   If the city becomes aware of an emergency regarding a registrant’s facilities, the city will attempt to contact the local representative of each registrant affected, or potentially affected, by the emergency. In any event, the city may take whatever action it deems necessary to respond to the emergency, the cost of which shall be borne by the registrant whose facilities occasioned the emergency.
   (B)   Non-emergency situations. Except in an emergency, any person who, without first having obtained the necessary permit, obstructs or excavates a right-of-way must subsequently obtain a permit and, as a penalty, pay double the normal fee for said permit, pay double all the other fees required by the city code, deposit with the city the fees necessary to correct any damage to the right-of-way, and comply with all of the requirements of this subchapter.
(Ord. 7517, passed 10-20-2009)
§ 96.20 SUPPLEMENTARY NOTIFICATION.
   If the obstruction or excavation of the right-of-way begins later or ends sooner than the date given on the permit, permittee shall notify the city of the accurate information as soon as this information is known.
(Ord. 7517, passed 10-20-2009)
§ 96.21 REVOCATION OF PERMITS.
   (A)   Substantial breach. The city reserves its right, as provided herein, to revoke any right-of-way permit without a fee refund, if there is a substantial breach of the terms and conditions of any statute, ordinance, rule or regulation, or any material condition of the permit. A substantial breach by permittee shall include, but shall not be limited to, the following:
      (1)   The violation of any material provision of the right-of-way permit;
      (2)   An evasion or attempt to evade any material provision of the right-of-way permit, or the perpetration or attempt to perpetrate any fraud or deceit upon the city or its citizens;
      (3)   Any material misrepresentation of fact in the application for a right-of-way permit;
      (4)   The failure to complete the work in a timely manner, unless a permit extension is obtained or unless the failure to complete work is due to reasons beyond the permittee’s control; or
      (5)   The failure to correct, in a timely manner, work that does not conform to a condition indicated on an order issued pursuant to § 96.18.
   (B)   Written notice of breach. If the city determines that the permittee has committed a substantial breach of a term or condition of any statute, ordinance, rule, regulation or any condition of the permit, the city shall make a written demand upon the permittee to remedy such violation. The demand shall state that continued violations may be cause for revocation of the permit. A substantial breach, as stated above, will allow the city, at its discretion, to place additional or revised conditions on the permit to mitigate and remedy the breach.
   (C)   Response to notice of breach. Within 24 hours of receiving notification of the breach, permittee shall provide the city with a plan, acceptable to the city, that will cure the breach. The permittee’s failure to so contact the city, or permittee’s failure to timely submit an acceptable plan, or permittee’s failure to reasonably implement the approved plan, shall be cause for immediate revocation of the permit. Further, permittee’s failure to so contact the city, or permittee’s failure to submit an acceptable plan, or permittee’s failure to reasonably implement the approved plan, shall automatically place the permittee on probation for one full year.
   (D)   Cause for probation. From time to time, the city may establish a list of conditions of the permit, which if breached will automatically place the permittee on probation for one full year, such as, but not limited to, working out of the allotted time period or working on right-of-way grossly outside of the permit authorization.
   (E)   Automatic revocation. If a permittee, while on probation, commits a breach as outlined above, permittee’s permit will automatically be revoked and permittee will not be allowed further permits for one full year, except for emergency repairs.
   (F)   Reimbursement of city costs. If a permit is revoked, the permittee shall also reimburse the city for the city’s reasonable costs, including restoration costs and the costs of collection and reasonable attorneys’ fees incurred in connection with such revocation.
(Ord. 7517, passed 10-20-2009)